Prairie State School PWD Lift Installation
Department of Education
Project details

Project Name
Prairie State School PWD Lift Installation

Client
Department of Education (DOE)

Date
Jan, 2026

Accessibility upgrades in schools are critical in ensuring equitable access to education.

Gripfast was engaged by DOE to manage a new PWD Lift Installation Project for Prairie State School, while in the process of delivering the new covered structure project at the same site. As an independent and technically different project, Gripfast managed this project separately, from procurement through to construction and DLP.

Delivered on a tight timeline, the project was completed before the commencement of the school year, requiring works to be undertaken during the wet season. Without the ability to delay the works, the project was impacted by these seasonal issues. The wet weather required the use of a larger crane to lift the elevator into place from the street, as the grounds were sodden and unsuitable for machinery to traverse. The weather also highlighted additional design considerations, as Z Flashings were added to the design of the lift’s base, and a bilge pump was installed to counteract water ingress issues.

While the delivery timeframe was challenging, this added complexity highlighted considerations that would be imperative to future-proofing the project, particularly from a seasonal perspective.